A door frame of dimensions 4m×3m is fixed on the wall of dimension 15m×15m.Find the total labour charges for painting the wall if the Labour charge for painting 1sq. m of the wall is Rs. 3.50
A and B are square matrices of order 3 each, |A| = 2 and |B| = 3. Find |3AB|.