Locate and Label the following
1. A line where the time period of withdrawal of monsoon is 1 December.
2. A line where the time period of withdrawal of monsoon is 15 October.
3. A line where the time period of withdrawal of monsoon is 1 September.
Answer:
-lock-
-endlock-