Question
A factory has 3 machines X, Y and Z, producing 1000, 2000 and 3000 bolts per day respectively. The machine X produces 1% defective bolts, Y produces 1.5% defective bolts and Z produces 2% defective bolts. At the end of the day, a bolt is drawn at random and it is found to be defective.
Let,
E1 = event of drawing a bolt produced by machine X.
E2 = event of drawing a bolt produced by machine Y.
E3 = event of drawing a bolt produced by machine Z.
E = event of drawing a defective bolt.
Based on the above information answer the following questions:
Question 1
What is the value of P(E2)?
(A) 1/6
(B) 1/3
(C) 1/2
(D) 1/4
Question 2
Find the value of P(E|E1)?
(A) 1/100
(B) 3/200
(C) 1/50
(D) 1/10
Question 3
Find the value of P(E | E2)?
(A) 1/100
(B) 3/200
(C) 1/50
(D) 1/10
Question 4
Find the value of P(E|E3)?
(A) 1/100
(B) 3/200
(C) 1/50
(D) 1/10
Question 5
What is the probability that the drawn bolt has been produced by the machine X?
(A) 1/10
(B) 3/200
(C) 1/20
(D) 1/30